C1801 Design Services for Hung Shui Kiu Station

Rail

C1801 Hung Shui Kiu Design

August 2021 to December 2023

Project
C1801 Design Services for Hung Shui Kiu Station
Phase
Preliminary to Detailed Design
Period
August 2021 to December 2023
Client
Aurecon – WSP JV
Owner
Mass Transit Railway Corporation (MTRC)
Contract
Owner Standard form

Hung Shui Kiu Station is to be built around the existing West Rail viaducts between Tin Shui Wai Station and Siu Hong Station and is envisaged to be a two-level station with at-grade concourse and elevated side-platforms with passenger lifts and escalators. Back of House staff accommodation and plant rooms would be provided.

Cranborne provided Aurecon – WSP JV with the Independent Value Engineering Specialist and the Construction Planning & Buildability Specialist.

Scope

The scope of work Cranborne delivered included

  • Preparation of the Proposal Submission Programme, which included the Design Programme; and
  • Development of a kit-of-parts and MiC methodology and sequence, including phased construction models.