C3310 North Runway Modification Works

Aviation

C3310 North Runway

December 2020 to May 2021

Project
C3310 North Runway Modification Works
Phase
Contractor Procurement
Period
December 2020 to May 2021
Client
China Road and Bridge Corporation
Owner
Airport Authority Hong Kong
Contract
Owner Standard form

The Airport Authority Hong Kong sought tenders for the Works under Contract 3310 – North Runway Modification Works, covering geotechnical, civil and structural engineering works with earthwork, excavation and temporary works; the construction of the Western and Eastern Vehicular Tunnels; Infrastructure and Airfield Works paving and utility installations; ground stabilisation; and ABWF, E&M and airport systems installations and ancillary buildings, through to obtaining the Aerodrome Licence for the operation of the 3RS.

Cranborne worked with China Road and Bridge Corporation to produce two of the most important method statements for the tender, and to strengthen China Road and Bridge Corporation's performance.

Scope

The key scope of work Cranborne delivered included

  • A review of tender documents applicable to the Services;
  • The provision of method statement and phasing for the new runway and taxiway works, resurfacing of the existing North Runway and taxiways, and installation of stormwater drainage, potable and firefighting water mains, power cable ducting, telecoms ducting, gas pipelines, the aviation fuel supply system and the AGL ducting system; and
  • The provision of an Interface Co-ordination method statement, Interface Management Plan and Interface Schedule identifying all major interfacing issues and how to ensure effective delivery of the Works.
C3310 North Runway Modification Works
C3310 North Runway Modification Works · Hong Kong