Aurecon-WSP Joint Venture
August 2021
2023
The Mass Transit Railway Corporation (MTR) awarded the Works under Contract C1801 Design Services for Hung Shui Kiu Station which was to be built around the existing West Rail viaducts between Tin Shui Wai Station and Siu Hong Station and is envisaged to be a two-level station with at-grade concourse and elevated side-platforms. Two station with passenger lifts, escalators and staircases. Back of House staff accommodation and plant rooms would be provided to cope with railway operations and maintenance requirements.
The design services is to develop a preferred scheme to satisfy the transport and railway requirements, taking into consideration the engineering, cost, programme, risks to delivery, interface issues and land and environmental implications. Cranborne worked with Aurecon – WSP JV during the tender, preliminary design, and reference design stages to develop the primary and secondary buildable methods, as the
Meinhardt Infrastructure & Environment Ltd
June 2022
Aug 2022
Meinhardt Infrastructure & Environment Limited (MHK) was appointed by the Airport Authority Hong Kong (AAHK), on 21 September 2021, to carry out the Scheme Design and Environmental Impact Assessment Consultancy Services for the Airport Tung Chung Link and Airport City Cove. The Airport Tung Chung Link (ATCL), is an Autonomous Transportation System, to connect the airport island/the Hong Kong Port (HKP) island to Tung Chung Town Centre and the Airport City Cove (ACC).
The key scope of work we delivered on this project was the provision of buildability reports for
China Road and Bridge Corporation
December 2020
May 2021
The Airport Authority Hong Kong sought tenders for the Works under Contract 3310 – North Runway Modification Works for geotechnical, civil and structural engineering works with earthwork, excavation and temporary works and the construction of the Western and Eastern Vehicular Tunnels, Infrastructure and Airfield Works paving and utility installations, ground stabilisation, and ABWF, E&M, airport systems installations and ancillary buildings, to obtaining the Aerodrome Licence for the operation of the 3RS. Cranborne worked with China Road and Bridge Corporation to produce two of the most important method statements for the tender, and strengthen China Road and Bridge Corporation’s performance.
The key scope of work Cranborne delivered included
China State Construction Engineering Ltd
December 2019
September 2020
The Airport Authority Hong Kong sought tenders for Contract 3408 – Third Runway Concourse and Apron Works for the construction of the Third Runway Concourse with fixed link and aircraft loading bridges; 36 serviced aircraft frontal stands, 27 serviced remote stands and taxilanes and apron areas; two cross-field taxiways; 22 ancillary buildings; parts of the Eastern Vehicular Tunnel; associated infrastructure works; and testing, commissioning. Cranborne acted as the key representative of China State to the Airport Authority Hong Kong, in terms of the technical aspects to the Airport Authority Hong Kong during the ECI and tender.
The key scope of work Cranborne delivered included leading the creation of the Preliminary Method Statements for:
Mott MacDonald Limited
June 2018
September 2019
The Airport Authority Hong Kong awarded Contract 3138 to Mott MacDonald for the provision of detailed design consultancy services, including associated construction stage design support services, for the new Terminal 2 to Third Runway Concourse tunnels, to accommodate the new Automatic People Mover system and Baggage Handling System, as part of the Three Runway System (3RS) project. Cranborne worked with Mott MacDonald and the Airport Authority to co-ordinate the Works during detailed design and contractor procurement phases, and provide assistance to the Airport Authority to co-ordinate the inputs from all relevant consultants to the 3802 Works Contract documents.
The key scope of work Cranborne delivered included